TECHNICAL AUTHORITY CONTENT

MEP Estimating Technical Guides

In-depth technical resources written from the estimator's perspective. Each guide covers code compliance, system design parameters, cost drivers, and estimating methodology for specialized building types and MEP systems.

CA

Title 24 MEP Estimating Requirements

How California's Title 24 energy code impacts HVAC sizing, lighting power density, envelope trade-offs, and compliance documentation. Covers all 16 climate zones.

Energy Code HVAC Lighting
NY

NYC LL97 Impact on MEP Estimating

How New York City's Local Law 97 carbon emission limits affect HVAC electrification, electrical service upgrades, retrofit estimating, and compliance costs.

Carbon Compliance Electrification Retrofit
BIM

BIM Clash Detection Workflow for Estimators

How estimators use BIM clash detection to identify coordination-driven cost impacts, translate model clashes to quantified pricing, and document scope risks.

Coordination Navisworks Cost Impact
DC

HVAC Estimating for Data Centers

Cooling system architectures, N+1 redundancy impact, economization strategies, PUE targets, and cost drivers at scale for data center HVAC estimates.

Cooling PUE Hyperscale
MG

Medical Gas Estimating for Healthcare Facilities

NFPA 99 compliance requirements, system components by gas type, takeoff methodology, cost drivers, and Category 1-4 impact on medical gas system estimates.

NFPA 99 Healthcare Piping
EV

EV Battery Plant MEP Estimating Challenges

Dry room HVAC, process electrical at gigafactory scale, process cooling systems, and cost drivers for EV battery manufacturing facilities from 50-200 GWh.

Gigafactory Dry Room Process
SF

Semiconductor Facility HVAC Estimating

Cleanroom HVAC systems at ISO Class 3-5, exhaust management (20+ exhaust streams), process cooling, and electrical distribution at 80-150 MW fab scale.

Cleanroom Exhaust Fab
QA

MEP Quantity Takeoff QA Checklist

7-phase quality control process for MEP quantity takeoffs covering drawing cross-check, duplicate prevention, pricing review, and final estimator review.

Quality Control Takeoff Methodology
DR

How Estimators Handle Drawing Revisions

Addenda processing protocol, RFI impact analysis, revision tracking methodology, and bid-day revision protocol for managing drawing changes during the bid period.

Addenda RFIs Scope Change
PF

Commercial Plumbing Fixture Count Methodology

IPC vs. UPC fixture ratio tables, occupant load determination, ADA requirements, special occupancy considerations, and step-by-step estimator workflow.

IPC UPC Fixture Counts

These guides are part of our commitment to transparent, technically accurate MEP estimating. Each guide is written from direct field and estimating experience and is updated as codes and technologies evolve. For project-specific questions, contact our estimating team.

Get Your Quote