- Project type
- Healthcare — Acute Care Hospital (200 beds)
- Building size
- 280,000 sq ft (5 stories + basement)
- Estimate scope
- Full Division 22 — domestic water, sanitary waste, vent, storm drainage, medical gas (O2, N2O, medical air, vacuum, nitrogen), grease waste, natural gas, and plumbing fixtures
- Coordination complexity
- High — 5-story hospital with full basement. Medical gas risers, sanitary stacks, and domestic water booster pumps all compete for ceiling space. OR and ICU zones have additional NFPA 99 segregation requirements.
Plumbing Estimating Services —
24–48 Hour Div 22 Takeoffs
On a high-rise, the plumbing riser shaft is shared with mechanical, electrical and fire-protection routes. Counting only the main riser misses branches, offsets, PRV zones and penetrations that the issued riser and plans still show. Those items are measured separately when they are on the drawings; a percentage is not added for work the set does not show.
What a Division 22 plumbing estimate counts
CSI MasterFormat: Division 22 plumbing. Division 21 fire suppression is a separate quoted scope and is not folded into a fixture count.
What is counted
- Fixtures by type from the fixture schedule and plans
- Domestic cold water, hot water, and recirculation pipe by material and diameter
- Sanitary waste, vent, and storm pipe by material and size, with vertical stacks separate from horizontal runs
- Valves, cleanouts, interceptors, water heaters, and pumps shown on the drawings
- Division 21 sprinkler mains, branch lines, heads, and fire pumps only when fire-protection drawings are quoted on their own
- Medical gas only when the quote explicitly accepts that specialty
What you receive
- An Excel takeoff sheet with quantities, units, CSI division, and sheet references.
- A priced estimate when the quote includes material and labor pricing.
- Color-coded PDF markups when the quote includes marked drawings.
Review redacted sample estimates. Client details are removed, and the files are shared with permission.
Software
PlanSwift, Bluebeam, AutoCAD, Revit, and Trimble are already named on this site as tools used for takeoff and drawing review. FastPIPE, FastDUCT, Accubid, and Excel are common in the trade. The quote names the file you receive. Naming a package does not mean every tool is opened on every job.
Most estimates in this scope are typically $150–$1,000 and most are returned in 24–48 hours. The fee moves with project size, the trades included, and plan quality. Review MEP estimating services pricing.
Governed by IPC, UPC, and NFPA 99 standards. All domestic water, drainage fixture unit (DFU), and medical gas takeoff calculations undergo multi-tier preconstruction audits prior to bid day delivery.
Risers, routes and connection boundaries
Reconcile floor plans with riser diagrams and fixture schedules. Record pipe systems, materials, specified sizes, vertical rises, offsets, cleanouts and fittings without treating a plan-view line as the complete installed route.
Water-pressure zones and booster or pressure-reducing assemblies follow the issued engineering design. Do not infer a required zone count from floor count or a single height threshold. Flag missing assemblies and unresolved connections in the assumptions list.
Domestic hot water and recirculation scope
Check whether the drawings show recirculation returns, pumps, balancing valves, controls and insulation. Quantify the drawn return path separately from hot-water supply; do not add a universal percentage to supply footage.
Confirm the trade responsible for water-heater power, controls, condensate and equipment drains. Record absent schedules, unspecified routing or unclear insulation as scope questions before pricing.
Specialty plumbing requires an accepted scope
Medical-gas work is distinct from a standard domestic-water or sanitary takeoff. Before appointment, confirm specialist capability, the issued system design, applicable requirements, materials, testing, verification and division of responsibilities.
The public sample does not establish medical-gas credentials or completed healthcare projects. Include specialty work only where it is explicitly accepted in the project quote; do not infer qualification from the presence of a service description.
Grease waste: measure the specified system
Review the kitchen equipment connections, specified waste-pipe material, interceptor schedule, venting, access and cleaning provisions on the issued drawings. Identify the boundary between equipment-vendor connections, building plumbing and site utilities.
Pipe slopes, cleanout spacing and interceptor selection depend on the applicable design and adopted requirements. Do not assign a universal cost multiplier, cleanout interval or slope to all grease-waste projects.
Fixture-unit review: distinguish water supply and drainage
Water-supply fixture units and drainage fixture units serve different calculations. Values depend on the adopted edition, fixture type, use and local amendments. They cannot be substituted or compared using a single public water-closet value.
Take off pipe sizes from the issued design and flag conflicts for clarification by the design team. Do not assume that one code always produces a larger pipe or a fixed cost premium. Consult the ICC code library and IAPMO Uniform Plumbing Code resources for the applicable project edition.
Illustrative scope scenario
Hospital Plumbing & Medical Gas Estimate — 200-Bed Acute Care
A full Division 22 estimate for a 200-bed acute care hospital demonstrating how medical gas NFPA 99 compliance, sanitary waste coordination, and domestic hot water recirculation are quantified across a complex healthcare facility.
This scenario explains potential scope and proposed deliverables. It is not a documented completed project, verified software-use record or performance result. Inspect the real source-verified quantity excerpt.
Example trade scope
- Domestic water piping
- Sanitary waste & vent
- Storm drainage
- Medical gas systems (5 gases)
- Natural gas piping
- Plumbing fixtures & trim
- Grease waste
- Water treatment
Confirm required software compatibility
- Planswift
- Bluebeam Revu
- Trimble AutoBid
- McQuay Pipe Sizing
Deliverables
- Complete Div 22 quantity takeoff by system
- Medical gas zone valve box count and placement verification
- PRV zone isolation valve schedule
- IPC fixture-unit sizing report
- Core-drill count and cost estimate
- Coordination conflict log with MEP trades
Scope risks to review
- NFPA 99 medical gas source equipment room had conflicting dimensions between E-sheets and P-sheets — 2 ft clearance gap found
- Sanitary stack offset at floor 4 conflicted with structural transfer beam — offset required redesign
- DHW recirculation system required 3 PRV zones: spec only showed 1 zone — added $48,000 in un-budgeted valving and return piping
- Grease waste kitchen plumbing shown as standard DWV — upgraded to cast iron with extra hub depth per IPC 814
Review before appointment
Agree deliverables, assumptions, exclusions and responsibilities in a written quote. The verified public sample demonstrates selected quantities only; project results and specialist qualifications require separate documentation.
Illustrative format — not a verified project record
Plumbing Quantity Takeoff — 200-Bed Hospital (Sample Lines)
Representative line items from an actual hospital plumbing takeoff. All project-identifying details removed.| CSI Div. | System | Sample line item | Quantity | Unit |
|---|---|---|---|---|
| 22 11 00 | Domestic Water | Type L copper, 4" domestic water main Booster pump to top floor — 3 PRV zones | 480 | LF |
| 22 11 00 | Domestic Water | Type L copper, 2" hot water supply (riser) 5 floors x 480 ft per floor | 2,400 | LF |
| 22 11 00 | Domestic Water | Type L copper, 1-1/2" recirculation return Return line: 85% of supply length | 2,100 | LF |
| 22 13 00 | Sanitary Waste | Cast iron no-hub, 4" sanitary waste (horizontal) | 3,200 | LF |
| 22 13 00 | Sanitary Waste | Cast iron no-hub, 4" sanitary stack (vertical) 5 floors at 120 ft each + offset | 600 | LF |
| 22 14 00 | Storm Drainage | Cast iron no-hub, 6" storm leader (vertical) 3 roof drains x 120 ft each | 360 | LF |
| 22 15 00 | Medical Gas | Type K copper, 1" oxygen supply (riser) NFPA 99 brazed joints — certification required | 480 | LF |
| 22 15 00 | Medical Gas | Zone valve box assembly (4-gas) One per nursing zone: $2,500–$5,500 each | 28 | EA |
| 22 15 00 | Medical Gas | Medical gas outlet, O2 Headwall outlets in patient rooms, ICU, OR | 420 | EA |
| 22 15 00 | Medical Gas | Medical gas outlet, Vacuum Patient rooms + procedure rooms | 360 | EA |
| 22 15 00 | Medical Gas | Master alarm panel (5-gas monitoring) $8,500–$15,000 | 1 | EA |
| 22 15 00 | Medical Gas | Area alarm panel One per zone: $1,800–$3,500 | 14 | EA |
| 22 15 00 | Medical Gas | Oxygen manifold (12-bottle) Source equipment room | 1 | EA |
| 22 40 00 | Plumbing Fixtures | Water closet, flush-valve, wall-hung Public + patient rooms | 180 | EA |
| 22 40 00 | Plumbing Fixtures | Lavatory, vitreous china, wall-hung With sensor faucet | 200 | EA |
| 22 52 00 | Natural Gas | Schedule 40 black steel, 3" gas main | 360 | LF |
| 22 52 00 | Natural Gas | Pressure regulator assembly, 3" | 1 | EA |
These example quantities explain the proposed format; they are not source-verified project results. Inspect our real coordinated MEP excerpt and drawings.
- Medical gas quantities assume Type K copper (NFPA 99 minimum) — verify OR and ICU zones require Type L or better
- Sanitary waste quantities include wye branches at every floor plus stack offset fitting allowance
- Core drilling: 82 holes estimated at $85–$250 each depending on rebar encountering probability
- Fixture trim allowances based on mid-range commercial grade — upgrade to specification grade adds 25–35%
Plumbing coordination: drawing checks before pricing
Planning scenarios for contractor review. These are scope checks, not records of completed projects or measured conflict frequencies.
Pump-room piping and access
Compare pumps, valves and pipe routes with the equipment-room layout, sections and maintenance access requirements.
Record confirmed route lengths, fittings, supports and connection assemblies. Identify unresolved access or relocation requirements as clarifications.
Request coordinated plans where the schematic does not define routing. Measure the issued arrangement; the design team resolves clearance conflicts.
Riser offsets at structural elements
Compare riser diagrams and plan locations with beams, slabs and approved openings. A schematic vertical line may not define the installed route.
Measure confirmed offsets and count the associated fittings, supports, sleeves and access provisions. Keep uncertain routing identifiable.
Log conflicting references and request an approved routing detail. Do not assume a structural redesign or additional stack without design instruction.
Specialty medical-gas scope
If specialty medical-gas work is explicitly accepted, review issued valve-box, alarm, outlet and equipment schedules with the qualified project specialists.
Separate specialty components, installation constraints, testing and verification responsibilities from standard plumbing quantities.
Confirm capability, applicable design requirements and exact boundaries before appointment. The public plumbing excerpt does not substantiate medical-gas experience or certification.
Grease-waste routing and ceiling depth
Use the specified materials, design slopes, elevations and interceptor connections for the actual project. Do not assign one slope or cost multiplier to all grease-waste systems.
Measure the issued route and identify fittings, access and any separately instructed enclosure or ceiling work.
Compare plumbing elevations with architectural sections and other services. Refer insufficient space or conflicting slopes to the design team before pricing an assumed solution.
Plumbing Estimating QA Methodology — 7-Phase Review Process
Every plumbing estimate undergoes this structured QA process before delivery. Each phase targets a specific class of estimating error specific to plumbing and medical gas work.
Plumbing Estimating — Related Technical Guides
These guides provide deeper technical coverage of specific estimating challenges referenced throughout this page.
Plumbing estimating: scope and deliverables
How are plumbing estimate fees and delivery usually set?
A plumbing estimate is typically $150–$1,000. Most are finished within 24–48 hours, depending on project size and scope.
How are plumbing fixtures, pipe and fittings counted?
Reconcile fixture and equipment schedules with the plans and risers. Measure pipe by system, material and specified size; count fittings, valves and equipment separately. Identify domestic water, sanitary waste and vent boundaries, and record assumptions where routing or schedules are incomplete.
Can IPC and UPC fixture-unit values be substituted?
No. Confirm the adopted edition, local amendments, fixture type and whether the calculation concerns water-supply or drainage fixture units. The design team determines sizing. A takeoff records the issued sizes and flags conflicts; it should not infer a universal pipe-size or cost difference between codes.
Does the sample demonstrate medical-gas or specialty process work?
The public excerpt contains 19 selected plumbing lines and two cropped plumbing drawings. It supports review of those published quantities. Medical gas, process piping, fire protection and verification testing require a separately confirmed scope and appropriate specialist review.
What are MEP estimating services?
MEP estimating services measure and, when requested, price CSI Divisions 21–28 from issued drawings. The usual scope is Division 22 plumbing, Division 23 mechanical, and Division 26 electrical. Division 21 fire suppression, Division 25 integrated automation, Division 27 communications, and Division 28 electronic safety are included only when those sheets are in the written quote.
How is coordinated MEP estimating different from single-trade HVAC or electrical estimating?
Coordinated MEP estimating reviews trade interfaces—equipment power, condensate, controls, supports and penetrations—across M/E/P drawings. A single-trade request can still be quoted; multi-trade packages should state which interfaces are reconciled versus left for the contractor.
How are mechanical, electrical and plumbing interfaces reviewed?
Compare equipment tags across the mechanical schedule, electrical connections and plumbing requirements. Record unclear feeds, condensate drains, controls, supports and penetrations in a scope clarification list, with the responsible trade and drawing reference. This drawing-based review does not establish complete model coordination or replace engineering design.
Can I inspect real takeoff quantities before requesting a quote?
Yes. The sample workspace contains one approved coordinated MEP excerpt with 90 selected lines: 19 plumbing, 32 mechanical and 39 electrical. Six cropped drawing previews provide context. Original units and stored quantity precision are preserved; private pricing and the original workbook are not published.
Inspect source quantities and drawing previews or request a scoped quote.
Upload Your Plumbing Riser Diagram
Most plumbing estimates are typically $150 to $1,000, depending on project size and scope, and most are returned in 24–48 hours. Upload the riser diagram with the drawing set so the quote can name the fee, the files and the delivery date.
Upload Riser Diagram for a QuoteReview the deliverable
Measured quantities, clear trade boundaries
Inspect 90 selected lines and 6 cropped drawings in our coordinated MEP sample. This excerpt demonstrates the published quantity format; it does not substantiate every specialty service or a complete project price.
Division 22: Plumbing
Reconcile fixtures and equipment against plumbing schedules. Keep domestic water, sanitary waste and vent quantities separate by material and size; identify fittings, valves and connection boundaries. Pipe sizing and medical-gas design require the issued design and qualified review.
Plumbing estimating scope19 selected source lines available in the sample.
Agree these items before the takeoff starts
Confirm the drawing issue and addenda, measurement units, base quantities versus allowances, trade responsibility for equipment connections, and assumptions for missing information. A priced estimate also needs dated supplier pricing, labor basis, taxes, freight and exclusions agreed for your project.
Drawing-based coordination flags scope interfaces. BIM clash detection, engineering design, specialty process systems and code certification require a separately confirmed scope and supporting documents.
Send plans for a scoped quote