DIVISION 22 PLUMBING ESTIMATING SERVICES

Plumbing Estimating Services —
24–48 Hour Div 22 Takeoffs

On a high-rise, the plumbing riser shaft is shared with mechanical, electrical and fire-protection routes. Counting only the main riser misses branches, offsets, PRV zones and penetrations that the issued riser and plans still show. Those items are measured separately when they are on the drawings; a percentage is not added for work the set does not show.

For Subcontractors: Plumbing Takeoffs & Pipe Counts → • For General Contractors: Div 22 Bid Leveling → • Technical Guide: Division 22 Estimating Guide → • Commercial Projects: Commercial Plumbing →

Request a Project Estimate

Share your project details. Fields marked * are required.

Contact and project details
Include + and your international calling code.

Project Drawings (optional)

PDF, CAD/BIM, Office, ZIP or image documents. Up to 5 files, 25 MB each; account limits also apply.

    Upload only documents you are authorized to share. Privacy policy. This request does not opt you into marketing messages.

    What a Division 22 plumbing estimate counts

    CSI MasterFormat: Division 22 plumbing. Division 21 fire suppression is a separate quoted scope and is not folded into a fixture count.

    What is counted

    • Fixtures by type from the fixture schedule and plans
    • Domestic cold water, hot water, and recirculation pipe by material and diameter
    • Sanitary waste, vent, and storm pipe by material and size, with vertical stacks separate from horizontal runs
    • Valves, cleanouts, interceptors, water heaters, and pumps shown on the drawings
    • Division 21 sprinkler mains, branch lines, heads, and fire pumps only when fire-protection drawings are quoted on their own
    • Medical gas only when the quote explicitly accepts that specialty

    What you receive

    • An Excel takeoff sheet with quantities, units, CSI division, and sheet references.
    • A priced estimate when the quote includes material and labor pricing.
    • Color-coded PDF markups when the quote includes marked drawings.

    Review redacted sample estimates. Client details are removed, and the files are shared with permission.

    Software

    PlanSwift, Bluebeam, AutoCAD, Revit, and Trimble are already named on this site as tools used for takeoff and drawing review. FastPIPE, FastDUCT, Accubid, and Excel are common in the trade. The quote names the file you receive. Naming a package does not mean every tool is opened on every job.

    Most estimates in this scope are typically $150–$1,000 and most are returned in 24–48 hours. The fee moves with project size, the trades included, and plan quality. Review MEP estimating services pricing.

    💧
    Division 22 Technical Practice Group
    Plumbing & Industrial Piping Review Team

    Governed by IPC, UPC, and NFPA 99 standards. All domestic water, drainage fixture unit (DFU), and medical gas takeoff calculations undergo multi-tier preconstruction audits prior to bid day delivery.

    Risers, routes and connection boundaries

    Reconcile floor plans with riser diagrams and fixture schedules. Record pipe systems, materials, specified sizes, vertical rises, offsets, cleanouts and fittings without treating a plan-view line as the complete installed route.

    Water-pressure zones and booster or pressure-reducing assemblies follow the issued engineering design. Do not infer a required zone count from floor count or a single height threshold. Flag missing assemblies and unresolved connections in the assumptions list.

    Domestic hot water and recirculation scope

    Check whether the drawings show recirculation returns, pumps, balancing valves, controls and insulation. Quantify the drawn return path separately from hot-water supply; do not add a universal percentage to supply footage.

    Confirm the trade responsible for water-heater power, controls, condensate and equipment drains. Record absent schedules, unspecified routing or unclear insulation as scope questions before pricing.

    Specialty plumbing requires an accepted scope

    Medical-gas work is distinct from a standard domestic-water or sanitary takeoff. Before appointment, confirm specialist capability, the issued system design, applicable requirements, materials, testing, verification and division of responsibilities.

    The public sample does not establish medical-gas credentials or completed healthcare projects. Include specialty work only where it is explicitly accepted in the project quote; do not infer qualification from the presence of a service description.

    Grease waste: measure the specified system

    Review the kitchen equipment connections, specified waste-pipe material, interceptor schedule, venting, access and cleaning provisions on the issued drawings. Identify the boundary between equipment-vendor connections, building plumbing and site utilities.

    Pipe slopes, cleanout spacing and interceptor selection depend on the applicable design and adopted requirements. Do not assign a universal cost multiplier, cleanout interval or slope to all grease-waste projects.

    Fixture-unit review: distinguish water supply and drainage

    Water-supply fixture units and drainage fixture units serve different calculations. Values depend on the adopted edition, fixture type, use and local amendments. They cannot be substituted or compared using a single public water-closet value.

    Take off pipe sizes from the issued design and flag conflicts for clarification by the design team. Do not assume that one code always produces a larger pipe or a fixed cost premium. Consult the ICC code library and IAPMO Uniform Plumbing Code resources for the applicable project edition.

    Illustrative scope scenario

    Hospital Plumbing & Medical Gas Estimate — 200-Bed Acute Care

    A full Division 22 estimate for a 200-bed acute care hospital demonstrating how medical gas NFPA 99 compliance, sanitary waste coordination, and domestic hot water recirculation are quantified across a complex healthcare facility.

    This scenario explains potential scope and proposed deliverables. It is not a documented completed project, verified software-use record or performance result. Inspect the real source-verified quantity excerpt.

    Example project inputs Schedule confirmed per quote
    Project type
    Healthcare — Acute Care Hospital (200 beds)
    Building size
    280,000 sq ft (5 stories + basement)
    Estimate scope
    Full Division 22 — domestic water, sanitary waste, vent, storm drainage, medical gas (O2, N2O, medical air, vacuum, nitrogen), grease waste, natural gas, and plumbing fixtures
    Coordination complexity
    High — 5-story hospital with full basement. Medical gas risers, sanitary stacks, and domestic water booster pumps all compete for ceiling space. OR and ICU zones have additional NFPA 99 segregation requirements.

    Example trade scope

    • Domestic water piping
    • Sanitary waste & vent
    • Storm drainage
    • Medical gas systems (5 gases)
    • Natural gas piping
    • Plumbing fixtures & trim
    • Grease waste
    • Water treatment

    Confirm required software compatibility

    • Planswift
    • Bluebeam Revu
    • Trimble AutoBid
    • McQuay Pipe Sizing

    Deliverables

    • Complete Div 22 quantity takeoff by system
    • Medical gas zone valve box count and placement verification
    • PRV zone isolation valve schedule
    • IPC fixture-unit sizing report
    • Core-drill count and cost estimate
    • Coordination conflict log with MEP trades

    Scope risks to review

    • NFPA 99 medical gas source equipment room had conflicting dimensions between E-sheets and P-sheets — 2 ft clearance gap found
    • Sanitary stack offset at floor 4 conflicted with structural transfer beam — offset required redesign
    • DHW recirculation system required 3 PRV zones: spec only showed 1 zone — added $48,000 in un-budgeted valving and return piping
    • Grease waste kitchen plumbing shown as standard DWV — upgraded to cast iron with extra hub depth per IPC 814

    Review before appointment

    Agree deliverables, assumptions, exclusions and responsibilities in a written quote. The verified public sample demonstrates selected quantities only; project results and specialist qualifications require separate documentation.

    Illustrative format — not a verified project record

    Plumbing Quantity Takeoff — 200-Bed Hospital (Sample Lines)

    Representative line items from an actual hospital plumbing takeoff. All project-identifying details removed.
    14,460 LF Total Pipe Takeoff
    840 Medical Gas Outlets
    520 Plumbing Fixtures
    28 Zone Valve Boxes
    CSI Div. System Sample line item Quantity Unit
    22 11 00 Domestic Water Type L copper, 4" domestic water main Booster pump to top floor — 3 PRV zones 480 LF
    22 11 00 Domestic Water Type L copper, 2" hot water supply (riser) 5 floors x 480 ft per floor 2,400 LF
    22 11 00 Domestic Water Type L copper, 1-1/2" recirculation return Return line: 85% of supply length 2,100 LF
    22 13 00 Sanitary Waste Cast iron no-hub, 4" sanitary waste (horizontal) 3,200 LF
    22 13 00 Sanitary Waste Cast iron no-hub, 4" sanitary stack (vertical) 5 floors at 120 ft each + offset 600 LF
    22 14 00 Storm Drainage Cast iron no-hub, 6" storm leader (vertical) 3 roof drains x 120 ft each 360 LF
    22 15 00 Medical Gas Type K copper, 1" oxygen supply (riser) NFPA 99 brazed joints — certification required 480 LF
    22 15 00 Medical Gas Zone valve box assembly (4-gas) One per nursing zone: $2,500–$5,500 each 28 EA
    22 15 00 Medical Gas Medical gas outlet, O2 Headwall outlets in patient rooms, ICU, OR 420 EA
    22 15 00 Medical Gas Medical gas outlet, Vacuum Patient rooms + procedure rooms 360 EA
    22 15 00 Medical Gas Master alarm panel (5-gas monitoring) $8,500–$15,000 1 EA
    22 15 00 Medical Gas Area alarm panel One per zone: $1,800–$3,500 14 EA
    22 15 00 Medical Gas Oxygen manifold (12-bottle) Source equipment room 1 EA
    22 40 00 Plumbing Fixtures Water closet, flush-valve, wall-hung Public + patient rooms 180 EA
    22 40 00 Plumbing Fixtures Lavatory, vitreous china, wall-hung With sensor faucet 200 EA
    22 52 00 Natural Gas Schedule 40 black steel, 3" gas main 360 LF
    22 52 00 Natural Gas Pressure regulator assembly, 3" 1 EA

    These example quantities explain the proposed format; they are not source-verified project results. Inspect our real coordinated MEP excerpt and drawings.

    • Medical gas quantities assume Type K copper (NFPA 99 minimum) — verify OR and ICU zones require Type L or better
    • Sanitary waste quantities include wye branches at every floor plus stack offset fitting allowance
    • Core drilling: 82 holes estimated at $85–$250 each depending on rebar encountering probability
    • Fixture trim allowances based on mid-range commercial grade — upgrade to specification grade adds 25–35%
    DRAWING INTERFACE CHECKS

    Plumbing coordination: drawing checks before pricing

    Planning scenarios for contractor review. These are scope checks, not records of completed projects or measured conflict frequencies.

    Pump-room piping and access

    PlumbingElectricalMechanical Critical Impact
    Issue

    Compare pumps, valves and pipe routes with the equipment-room layout, sections and maintenance access requirements.

    Estimate Impact

    Record confirmed route lengths, fittings, supports and connection assemblies. Identify unresolved access or relocation requirements as clarifications.

    Resolution Approach

    Request coordinated plans where the schematic does not define routing. Measure the issued arrangement; the design team resolves clearance conflicts.

    Riser offsets at structural elements

    PlumbingStructural High Impact
    Issue

    Compare riser diagrams and plan locations with beams, slabs and approved openings. A schematic vertical line may not define the installed route.

    Estimate Impact

    Measure confirmed offsets and count the associated fittings, supports, sleeves and access provisions. Keep uncertain routing identifiable.

    Resolution Approach

    Log conflicting references and request an approved routing detail. Do not assume a structural redesign or additional stack without design instruction.

    Specialty medical-gas scope

    PlumbingArchitecturalMedical Equipment High Impact
    Issue

    If specialty medical-gas work is explicitly accepted, review issued valve-box, alarm, outlet and equipment schedules with the qualified project specialists.

    Estimate Impact

    Separate specialty components, installation constraints, testing and verification responsibilities from standard plumbing quantities.

    Resolution Approach

    Confirm capability, applicable design requirements and exact boundaries before appointment. The public plumbing excerpt does not substantiate medical-gas experience or certification.

    Grease-waste routing and ceiling depth

    PlumbingMechanicalArchitectural Medium Impact
    Issue

    Use the specified materials, design slopes, elevations and interceptor connections for the actual project. Do not assign one slope or cost multiplier to all grease-waste systems.

    Estimate Impact

    Measure the issued route and identify fittings, access and any separately instructed enclosure or ceiling work.

    Resolution Approach

    Compare plumbing elevations with architectural sections and other services. Refer insufficient space or conflicting slopes to the design team before pricing an assumed solution.

    Review basis: These scenarios explain what to check in the issued drawings. They do not establish past project experience, observed frequencies, standard cost uplifts or design approval. Resolve uncertain scope with the project team and record the estimate assumption.
    QA METHODOLOGY — 28 CHECKPOINTS

    Plumbing Estimating QA Methodology — 7-Phase Review Process

    Every plumbing estimate undergoes this structured QA process before delivery. Each phase targets a specific class of estimating error specific to plumbing and medical gas work.

    7Review Phases
    28Checkpoints
    SMACNA/NECAStandards Based
    Div 21–28CSI MasterFormat
    📐
    Phase 1

    Drawing Cross-Check

    Verify plumbing quantities against all drawing sets and ensure system coverage is complete.

    4 checks
    01.01
    Fixture count reconciled with architectural finish schedule and RCP
    01.02
    Sanitary waste, vent, and storm piping counted from P-sheets — not assumed from fixture count
    01.03
    Domestic water riser lengths verified from actual riser diagrams, not floor-count multiples
    01.04
    Medical gas system count verified against NFPA 99 matrix — all 5 gas types included where shown
    📋
    Phase 2

    Code Compliance Review

    Review piping sizing, slope, and materials against governing code (IPC or UPC).

    4 checks
    02.01
    Fixture-unit based pipe sizing verified — IPC vs. UPC tables applied correctly by jurisdiction
    02.02
    Grease waste slope verified at 1/4" per ft per IPC 814 — not standard DWV slope
    02.03
    Medical gas pipe sizing verified per NFPA 99 Chapter 5 — flow rate and pressure drop calculated
    02.04
    Backflow prevention configuration verified by occupancy type and jurisdiction
    🔧
    Phase 3

    Trade Coordination

    Identify plumbing scope overlaps and gaps with mechanical, fire protection, and structural trades.

    4 checks
    03.01
    Domestic water booster pump room coordination with electrical panel clearances (NEC 110.26)
    03.02
    Sanitary stack offsets verified against structural framing plan
    03.03
    Roof drain leaders coordinated with structural columns and pile caps
    03.04
    Natural gas meter and regulator placement coordinated with exterior site plan
    🔍
    Phase 4

    Duplicate Count Prevention

    Systematic cross-check to eliminate double-counted items across systems.

    4 checks
    04.01
    Plumbing fixture counts verified — not double-counted in both Div 22 and Div 11
    04.02
    Valve counts reconciled — balancing valves not counted as isolation valves
    04.03
    Pipe support quantities calculated per code spacing, not "one per stick" assumptions
    04.04
    Medical gas outlets not double-counted between zone valve assemblies and terminal units
    💰
    Phase 5

    Pricing Review

    Validate material pricing, specialty materials, and code-required upgrades.

    4 checks
    05.01
    Medical gas copper (Type K) priced at healthcare-grade — not standard Type L pricing
    05.02
    Cast iron no-hub pricing verified with current scrap metal index
    05.03
    Grease interceptor sized correctly — hydromechanical vs. gravity priced by flow rate
    05.04
    Plumbing fixture trim verified — specification grade vs. builder grade pricing applied
    ⚠️
    Phase 6

    Scope-Gap Verification

    Cross-reference estimate scope against spec for commonly missed plumbing items.

    4 checks
    06.01
    NFPA 99 verification testing and certification included ($12,000–$28,000)
    06.02
    Brazed joint certification (medical gas) included — third-party verification cost
    06.03
    Core drilling counted as separate line item — not buried in general piping labor
    06.04
    Temperature mixing valves at each fixture group counted (ASS 1016 compliance)
    ✅
    Phase 7

    Final Estimator Review

    Principal estimator signs off on completeness, pricing accuracy, and scope alignment.

    4 checks
    07.01
    Coordinated with medical equipment schedule — gas outlets match equipment locations
    07.02
    Exclusion log documented for all owner-furnished items (fixtures, water treatment systems)
    07.03
    Grease waste vs. standard DWV differential clearly separated in cost build-up
    07.04
    PRV zone schedule verified against floor-count and municipal pressure
    QA methodology note: This structured review aligns with SMACNA, NECA, and MCAA trade estimating standards across commercial, healthcare, industrial, and institutional projects. Each checkpoint targets specific scope gaps, measurement checks, and trade boundary verifications before estimate delivery.

    Plumbing estimating: scope and deliverables

    How are plumbing estimate fees and delivery usually set?

    A plumbing estimate is typically $150–$1,000. Most are finished within 24–48 hours, depending on project size and scope.

    How are plumbing fixtures, pipe and fittings counted?

    Reconcile fixture and equipment schedules with the plans and risers. Measure pipe by system, material and specified size; count fittings, valves and equipment separately. Identify domestic water, sanitary waste and vent boundaries, and record assumptions where routing or schedules are incomplete.

    Can IPC and UPC fixture-unit values be substituted?

    No. Confirm the adopted edition, local amendments, fixture type and whether the calculation concerns water-supply or drainage fixture units. The design team determines sizing. A takeoff records the issued sizes and flags conflicts; it should not infer a universal pipe-size or cost difference between codes.

    Does the sample demonstrate medical-gas or specialty process work?

    The public excerpt contains 19 selected plumbing lines and two cropped plumbing drawings. It supports review of those published quantities. Medical gas, process piping, fire protection and verification testing require a separately confirmed scope and appropriate specialist review.

    What are MEP estimating services?

    MEP estimating services measure and, when requested, price CSI Divisions 21–28 from issued drawings. The usual scope is Division 22 plumbing, Division 23 mechanical, and Division 26 electrical. Division 21 fire suppression, Division 25 integrated automation, Division 27 communications, and Division 28 electronic safety are included only when those sheets are in the written quote.

    How is coordinated MEP estimating different from single-trade HVAC or electrical estimating?

    Coordinated MEP estimating reviews trade interfaces—equipment power, condensate, controls, supports and penetrations—across M/E/P drawings. A single-trade request can still be quoted; multi-trade packages should state which interfaces are reconciled versus left for the contractor.

    How are mechanical, electrical and plumbing interfaces reviewed?

    Compare equipment tags across the mechanical schedule, electrical connections and plumbing requirements. Record unclear feeds, condensate drains, controls, supports and penetrations in a scope clarification list, with the responsible trade and drawing reference. This drawing-based review does not establish complete model coordination or replace engineering design.

    Can I inspect real takeoff quantities before requesting a quote?

    Yes. The sample workspace contains one approved coordinated MEP excerpt with 90 selected lines: 19 plumbing, 32 mechanical and 39 electrical. Six cropped drawing previews provide context. Original units and stored quantity precision are preserved; private pricing and the original workbook are not published.

    Inspect source quantities and drawing previews or request a scoped quote.

    Upload Your Plumbing Riser Diagram

    Most plumbing estimates are typically $150 to $1,000, depending on project size and scope, and most are returned in 24–48 hours. Upload the riser diagram with the drawing set so the quote can name the fee, the files and the delivery date.

    Upload Riser Diagram for a Quote

    Measured quantities, clear trade boundaries

    Inspect 90 selected lines and 6 cropped drawings in our coordinated MEP sample. This excerpt demonstrates the published quantity format; it does not substantiate every specialty service or a complete project price.

    Division 22: Plumbing

    Reconcile fixtures and equipment against plumbing schedules. Keep domestic water, sanitary waste and vent quantities separate by material and size; identify fittings, valves and connection boundaries. Pipe sizing and medical-gas design require the issued design and qualified review.

    Plumbing estimating scope

    19 selected source lines available in the sample.

    Agree these items before the takeoff starts

    Confirm the drawing issue and addenda, measurement units, base quantities versus allowances, trade responsibility for equipment connections, and assumptions for missing information. A priced estimate also needs dated supplier pricing, labor basis, taxes, freight and exclusions agreed for your project.

    Drawing-based coordination flags scope interfaces. BIM clash detection, engineering design, specialty process systems and code certification require a separately confirmed scope and supporting documents.

    Send plans for a scoped quote
    Get Your Quote