CONTRACTOR QUANTITY REVIEW

MEP Quantity Takeoff Services — CSI Div 21–28 Counts

Request measured mechanical, electrical and plumbing quantities from your issued drawings. Define the systems, measurement units, document revision and output format before work starts. Pricing, labor analysis and bid preparation are separate scope choices.

Compare a quantity takeoff with a priced estimate.

Request a Project Estimate

Share your project details. Fields marked * are required.

Contact and project details
Include + and your international calling code.

Project Drawings (optional)

PDF, CAD/BIM, Office, ZIP or image documents. Up to 5 files, 25 MB each; account limits also apply.

    Upload only documents you are authorized to share. Privacy policy. This request does not opt you into marketing messages.

    What an MEP quantity takeoff counts

    CSI MasterFormat: CSI Divisions 21–28. Division 22, 23, and 26 are the default measured set. Division 21, 25, 27, and 28 are counted only when those drawings are in the quote.

    What is counted

    • Division 21 fire suppression: mains, branch lines, heads, and fire pumps on the fire-protection sheets
    • Division 22 plumbing: fixtures and domestic, waste, vent, and storm pipe by material and size
    • Division 23 HVAC: duct by size, scheduled equipment, and hydronic or refrigerant pipe
    • Division 25 integrated automation: devices and panels on the controls sheets
    • Division 26 electrical: raceway, conductors, devices, lighting, and distribution equipment
    • Division 27 communications: drops, racks, tray, and cable
    • Division 28 electronic safety and security: fire alarm and security devices shown on those sheets

    What you receive

    • An Excel takeoff sheet with quantities, units, CSI division, and sheet references.
    • A priced estimate when the quote includes material and labor pricing.
    • Color-coded PDF markups when the quote includes marked drawings.

    Review redacted sample estimates. Client details are removed, and the files are shared with permission.

    Software

    PlanSwift, Bluebeam, AutoCAD, Revit, and Trimble are already named on this site as tools used for takeoff and drawing review. FastPIPE, FastDUCT, Accubid, and Excel are common in the trade. The quote names the file you receive. Naming a package does not mean every tool is opened on every job.

    Most estimates in this scope are typically $150–$1,000 and most are returned in 24–48 hours. The fee moves with project size, the trades included, and plan quality. Review MEP estimating services pricing.

    Choose the output your bid needs

    Quantities only

    Descriptions, measured quantities and units organized by the agreed trade, system, level or area. Confirm whether marked plans, source references and an assumptions register are included.

    Priced estimate

    Add dated material prices, supplier quotations, labor hours and rate assumptions to the measured quantities. Identify freight, taxes, escalation, waste and contractor markups separately; these are not inherent in a raw takeoff.

    Bid support

    Confirm alternates, exclusions, quote comparison and addendum updates in the proposal. The contractor reviews the final bid, purchasing basis and contractual terms.

    Start with HVAC scope, plumbing scope or electrical scope. Fire protection, medical gas, communications, security, specialist process systems and non-MEP trades need explicit capability and scope confirmation.

    Measurement basis by system

    Keep counts, lengths, areas and weights as distinct quantities.
    SystemMeasurement basisContractor review
    Mechanical ductworkLength by section size and material; area or weight only when the agreed measurement basis supports it.Keep fittings, dampers, hangers, liner and external insulation identifiable. Duct route length is not sheet-metal area.
    Mechanical equipmentCount each tagged unit and reconcile the equipment schedule with plans.List included accessories and the boundary for electrical feeds, controls, rigging, start-up and testing.
    Plumbing pipeworkMeasure by system, material and specified diameter; count fittings and valves separately.Separate domestic water, sanitary waste and vent systems. Flag unresolved risers, offsets, connections and below-grade limits.
    Electrical raceways and conductorsMeasure conduit routes by size/type; calculate specified conductor runs separately.Conductor count, parallel sets, terminations, rises and specified slack affect the wire quantity. Route length alone is insufficient.
    Fixtures and devicesCount scheduled items by tag/type and check drawing locations.Resolve symbols, duplicated schedule items and interfaces with owner-supplied equipment before pricing.

    Retain base quantity, allowance factor and adjusted quantity in separate fields. An allowance is a stated assumption, not a substitute for measurement. Do not add feet, each and square feet into one total or apply one waste percentage to every material.

    Documents to send with the request

    • Current plans, risers, schedules, details and applicable specifications.
    • Drawing issue date, addenda and a document register identifying superseded sheets.
    • Included systems, floor/area limits and boundaries with other subcontractors.
    • Required units, workbook structure, software import columns and whether pricing is requested.
    • Project location, bid deadline, phased-delivery needs and any supplied labor or vendor pricing.

    Resolve unclear documents before pricing

    1. Check the sheet index, schedules, scale and referenced details. Record missing documents and whether they prevent a reliable quantity.
    2. Log conflicting plan and specification references. Use the contract's order of precedence and request clarification; specifications do not universally override drawings.
    3. Distinguish measured routes from assumed routes. Identify the exact affected items and record each assumption rather than applying a blanket contingency.
    4. On revision, compare the previous and current issues, record additions and deductions, and identify the affected estimate version.

    Review the schedule before using it in a bid

    Trace selected high-value or uncertain lines to their drawing references. Reconcile equipment and device counts to schedules, check connection responsibilities, and verify the treatment of supports, insulation, testing and commissioning. Request corrections to unresolved quantities before the contractor approves the bid.

    A drawing-based takeoff does not establish engineering sizing, permit acceptance, fabrication readiness or field dimensions. BIM coordination, design calculations and specialty compliance reviews require their own agreed deliverables.

    Fee, delivery and revisions

    Most quantity takeoffs are typically $150–$1,000 and most are returned in 24–48 hours, depending on project size and scope. Agree the price, milestones, revision allowance and exclusions in writing before starting. A sample schedule is not a complete priced project, and a larger set can fall outside that usual window.

    Send your scope and drawing set

    Measured quantities, clear trade boundaries

    Inspect 90 selected lines and 6 cropped drawings in our coordinated MEP sample. This excerpt demonstrates the published quantity format; it does not substantiate every specialty service or a complete project price.

    Division 22: Plumbing

    Reconcile fixtures and equipment against plumbing schedules. Keep domestic water, sanitary waste and vent quantities separate by material and size; identify fittings, valves and connection boundaries. Pipe sizing and medical-gas design require the issued design and qualified review.

    Plumbing estimating scope

    19 selected source lines available in the sample.

    Division 23: Mechanical / HVAC

    Reconcile HVAC equipment tags, air outlets and ductwork against the mechanical schedules. Keep duct length, area or weight units distinct. Confirm whether hydronic or refrigerant piping, insulation, supports, controls and testing are included in the quoted scope.

    Mechanical / HVAC estimating scope

    32 selected source lines available in the sample.

    Division 26: Electrical

    Reconcile lighting and device counts against schedules. Distinguish conduit route length from conductor length, with conductor count and specified sizes recorded separately. Confirm feeds, disconnects and controls interfaces; fire alarm and low voltage require their own scope confirmation.

    Electrical estimating scope

    39 selected source lines available in the sample.

    Agree these items before the takeoff starts

    Confirm the drawing issue and addenda, measurement units, base quantities versus allowances, trade responsibility for equipment connections, and assumptions for missing information. A priced estimate also needs dated supplier pricing, labor basis, taxes, freight and exclusions agreed for your project.

    Drawing-based coordination flags scope interfaces. BIM clash detection, engineering design, specialty process systems and code certification require a separately confirmed scope and supporting documents.

    Send plans for a scoped quote

    Takeoff estimating: scope and deliverables

    What do most quantity takeoffs cost, and when do they come back?

    Most quantity takeoffs are typically priced from $150 to $1,000 and delivered in 24–48 hours, based on project size and scope.

    How can I check a quantity back to its source?

    Keep the item description, measurement unit, drawing reference and workbook source cell with each quantity. In the public sample, open a row to see the source reference, saved allowance factor and adjusted quantity. Different measurement units are never combined into one quantity total.

    Should a waste allowance replace the measured quantity?

    Keep the base measurement separate from the allowance and adjusted quantity. Confirm whether the saved factor is a multiplier or a percentage before applying it. Allowances depend on material, layout and procurement method; there is no universal rate for every MEP item.

    Which document takes precedence if plans and specifications disagree?

    Review the contract document order of precedence and request clarification. Record the conflicting references and the estimating assumption explicitly. There is no universal rule that specifications always override drawings or that one percentage threshold makes a conflict immaterial.

    What are MEP estimating services?

    MEP estimating services measure and, when requested, price CSI Divisions 21–28 from issued drawings. The usual scope is Division 22 plumbing, Division 23 mechanical, and Division 26 electrical. Division 21 fire suppression, Division 25 integrated automation, Division 27 communications, and Division 28 electronic safety are included only when those sheets are in the written quote.

    How is coordinated MEP estimating different from single-trade HVAC or electrical estimating?

    Coordinated MEP estimating reviews trade interfaces—equipment power, condensate, controls, supports and penetrations—across M/E/P drawings. A single-trade request can still be quoted; multi-trade packages should state which interfaces are reconciled versus left for the contractor.

    How are mechanical, electrical and plumbing interfaces reviewed?

    Compare equipment tags across the mechanical schedule, electrical connections and plumbing requirements. Record unclear feeds, condensate drains, controls, supports and penetrations in a scope clarification list, with the responsible trade and drawing reference. This drawing-based review does not establish complete model coordination or replace engineering design.

    Can I inspect real takeoff quantities before requesting a quote?

    Yes. The sample workspace contains one approved coordinated MEP excerpt with 90 selected lines: 19 plumbing, 32 mechanical and 39 electrical. Six cropped drawing previews provide context. Original units and stored quantity precision are preserved; private pricing and the original workbook are not published.

    Inspect source quantities and drawing previews or request a scoped quote.