MEP Estimating Services —
24–48 Hour CSI Div 21–28 Takeoffs

Request mechanical, electrical, and plumbing quantities or a priced estimate from your issued drawings. Division 21, 25, 27, and 28 are included when those sheets are in the quote. Most estimates are typically $150–$1,000 and delivered in 24–48 hours. See what drives the fee.

Request a Project Estimate

Share your project details. Fields marked * are required.

Contact and project details
Include + and your international calling code.

Project Drawings (optional)

PDF, CAD/BIM, Office, ZIP or image documents. Up to 5 files, 25 MB each; account limits also apply.

    Upload only documents you are authorized to share. Privacy policy. This request does not opt you into marketing messages.

    What an MEP estimate counts

    CSI MasterFormat: Divisions 21–28. Division 22 plumbing, Division 23 HVAC, and Division 26 electrical are measured on a standard coordinated set. Division 21 fire suppression, Division 25 integrated automation, Division 27 communications, and Division 28 electronic safety are counted only when those drawings are quoted.

    What is counted

    • Division 21: sprinkler mains, branch lines, heads, and fire pumps shown on the fire-protection drawings
    • Division 22: fixtures, domestic water, waste, vent, and storm pipe by material and size
    • Division 23: duct by size, equipment from the schedule, and hydronic or refrigerant pipe by system
    • Division 25: control devices and panels only when the integration sheets are in scope
    • Division 26: raceway by size, conductors separate from raceway, devices, lighting, and distribution equipment
    • Division 27: communications drops, racks, tray, and cable when those sheets are quoted
    • Division 28: fire alarm and electronic security devices when those sheets are quoted

    What you receive

    • An Excel takeoff sheet with quantities, units, CSI division, and sheet references.
    • A priced estimate when the quote includes material and labor pricing.
    • Color-coded PDF markups when the quote includes marked drawings.

    Review redacted sample estimates. Client details are removed, and the files are shared with permission.

    Software

    PlanSwift, Bluebeam, AutoCAD, Revit, and Trimble are already named on this site as tools used for takeoff and drawing review. FastPIPE, FastDUCT, Accubid, and Excel are common in the trade. The quote names the file you receive. Naming a package does not mean every tool is opened on every job.

    Most estimates in this scope are typically $150–$1,000 and most are returned in 24–48 hours. The fee moves with project size, the trades included, and plan quality. Review MEP estimating services pricing.

    Our Core Trade Services

    ❄️

    HVAC Estimating

    Detailed mechanical takeoffs including SMACNA ductwork, hydronic piping, and equipment schedules. Optimized for sheet metal and mechanical contractors.

    • Ductwork & Fittings by Gauge
    • Hydronic & Chilled Water Piping
    • Equipment & Terminal Unit Schedules
    Explore HVAC Services
    ⚡

    Electrical Estimating

    Comprehensive electrical takeoffs for power, lighting, and low-voltage systems. Aligned with NEC standards and local jurisdictional codes.

    • Conduit & Feeder Wire Sizing
    • Switchgear, Panels & Transformers
    • Fire Alarm, Data & Security
    Explore Electrical Services
    💧

    Plumbing Estimating

    Expert takeoffs for sanitary DWV, domestic water, gas, and medical gas piping. Quantities follow the supplied design; pipe sizing and code approval remain with the project design team.

    • Drainage & Venting Systems
    • Domestic Hot/Cold & Recirculation
    • Gas Piping & Fixture Counts
    Explore Plumbing Services
    📊

    Quantity Takeoff

    Precise material lists and Bill of Quantities (BOQ) for procurement and bidding. Digital takeoffs delivered in editable Excel with PDF markups.

    • Itemized Material Lists
    • Project-Specific Labor Basis
    • Bid Summary & Scope Exclusions
    Explore Takeoff Services
    🏗️

    BIM Coordination (VDC)

    Advanced Navisworks clash detection, Revit MEP modeling, and 3D coordination. Eliminate field rework and resolve spatial conflicts before fabrication.

    • LOD 350-400 Revit MEP Modeling
    • Navisworks Clash Detective Audits
    • BIM Execution Plan (BEP) Governance
    Explore BIM Services

    Estimator Workflow

    Service Delivery Workflow Across Trades

    Every service line follows the same control path: drawings are checked, scope boundaries are mapped, quantities are measured, pricing assumptions are validated, and the final deliverable is packaged with clarifications instead of hidden risk.
    1. Drawing QA

      Confirm addenda, schedules, risers, one-lines, equipment tags, architectural backgrounds, and specification sections before takeoff.

      Drawing QA log
    2. Trade Scope Split

      Separate HVAC, electrical, plumbing, fire protection, controls, commissioning, and owner-furnished equipment responsibilities.

      Scope matrix
    3. Quantity Takeoff

      Measure duct, pipe, conduit, cable, fixtures, devices, equipment, supports, and alternates by floor, area, and CSI division.

      Trade workbook
    4. Pricing Validation

      Apply labor units, market pricing, local wage assumptions, long-lead equipment checks, and jurisdiction-specific code allowances.

      Priced estimate
    5. Coordination Review

      Flag ceiling conflicts, shaft congestion, service capacity issues, and missing connection schedules before bid submission.

      Scope gap log
    6. Bid Deliverable

      Package estimate summary, assumptions, exclusions, alternates, and trade-by-trade quantities for contractor review.

      Bid-ready package

    Illustrative format — not a verified project record

    Cross-Trade Estimate Structure

    A service hub should show how trade estimates are actually structured. This sample demonstrates the type of line-item organization used across HVAC, electrical, plumbing, BIM, and quantity takeoff projects.
    5 trades
    Excel/PDF format
    Senior QA
    CSI scope
    CSI Div. System Sample line item Quantity Unit
    23 HVAC Rectangular duct with fittings and insulation Measured by pressure class and floor area. 18,400 LB
    26 Electrical EMT branch conduit with copper conductors Separated by feeder, branch, and low-voltage systems. 32,000 LF
    22 Plumbing Domestic water distribution with insulation Fixture-unit assumptions attached to the workbook. 6,800 LF
    00/01 Bid support Assumptions, exclusions, and scope clarification log Included with final deliverable so risk is visible. 1 SET

    These example quantities explain the proposed format; they are not source-verified project results. Inspect our real coordinated MEP excerpt and drawings.

    • The service pages link into state hubs because local code and labor assumptions change the estimate.
    • Resource pages support the workflow with checklists, BEP examples, and clash-resolution methods.

    Why Outsource Your MEP Estimation

    Winning bids in today's market requires more than just numbers—it requires a partner who understands the nuances of the USA construction landscape.

    Choose the required support

    Compare the quoted output with the measurement, pricing and review work your contractor team needs.

    Plan the bid deadline

    Confirm scope, addenda, staged delivery and revision requirements against your bid date.

    Document the pricing basis

    Keep dated supplier quotations, labor hours and rate assumptions with the estimate. Regional guidance is a review input; it does not prove local pricing calibration or code approval.

    Operational Resources

    Use our MEP bid checklist, drawing QA checklist, and clash matrix to understand the deliverables behind each estimate.

    Illustrative engineering review, not a photo of company staff

    Ready to get started

    Most MEP estimates are typically $150–$1,000, depending on project size and scope, and most are delivered in 24–48 hours.

    Join 500+ USA contractors who trust us with their most critical bids.

    Request a Custom Quote

    MEP rough-in and trim-out: define the estimating phase

    A request for MEP trim-out should identify what has already been installed and what remains in the bid. Do not measure a complete new system when the contractor needs only the remaining phase.

    • Rough-in scope: identify the documented distribution routes, supports, concealed connections and work carried by other contractors.
    • Trim-out scope: reconcile scheduled fixtures, devices, grilles and final connections with the phase drawings. Record owner-furnished items and installation responsibilities separately.
    • Completion activities: assign controls, testing, balancing, startup and commissioning explicitly. A counted device or equipment item does not automatically include these activities.

    Send the phase limits, current plans, schedules and addenda with your request. Identify existing or completed work and unresolved conditions so the proposal can state what will be measured, priced or excluded. Use the MEP bid checklist to organize the document set.

    Measured quantities, clear trade boundaries

    Inspect 90 selected lines and 6 cropped drawings in our coordinated MEP sample. This excerpt demonstrates the published quantity format; it does not substantiate every specialty service or a complete project price.

    Division 22: Plumbing

    Reconcile fixtures and equipment against plumbing schedules. Keep domestic water, sanitary waste and vent quantities separate by material and size; identify fittings, valves and connection boundaries. Pipe sizing and medical-gas design require the issued design and qualified review.

    Plumbing estimating scope

    19 selected source lines available in the sample.

    Division 23: Mechanical / HVAC

    Reconcile HVAC equipment tags, air outlets and ductwork against the mechanical schedules. Keep duct length, area or weight units distinct. Confirm whether hydronic or refrigerant piping, insulation, supports, controls and testing are included in the quoted scope.

    Mechanical / HVAC estimating scope

    32 selected source lines available in the sample.

    Division 26: Electrical

    Reconcile lighting and device counts against schedules. Distinguish conduit route length from conductor length, with conductor count and specified sizes recorded separately. Confirm feeds, disconnects and controls interfaces; fire alarm and low voltage require their own scope confirmation.

    Electrical estimating scope

    39 selected source lines available in the sample.

    Agree these items before the takeoff starts

    Confirm the drawing issue and addenda, measurement units, base quantities versus allowances, trade responsibility for equipment connections, and assumptions for missing information. A priced estimate also needs dated supplier pricing, labor basis, taxes, freight and exclusions agreed for your project.

    Drawing-based coordination flags scope interfaces. BIM clash detection, engineering design, specialty process systems and code certification require a separately confirmed scope and supporting documents.

    Send plans for a scoped quote
    Get Your Quote