MEP estimating by project type

Start with your issued design, the trades you are bidding and the deliverables you need. A building type alone does not establish the systems included, estimating effort or delivery date.

Commercial MEP

Review mechanical schedules, lighting and power plans, fixture schedules, risers and specifications together. Clarify tenant versus landlord work, owner-supplied equipment and connections between trades.

Explore commercial MEP estimating

Industrial MEP

Submit the relevant specifications, equipment schedules and any process documents. Specialty piping, hazardous locations, instrumentation and commissioning need explicit scope acceptance and appropriate technical review.

Review industrial MEP scope requirements

Residential and mixed-use enquiries

For residential work, identify unit types, repeated layouts, shared plant and utility boundaries. Use the existing trade service pages to define the mechanical, electrical and plumbing work, then send your plans for scope confirmation.

What to confirm in the quote

Request the drawing revision, included trades, quantity format, pricing basis, assumptions, exclusions, fee and delivery date in writing. Our public sample demonstrates a selected Divisions 22, 23 and 26 quantity excerpt; it does not establish completed industrial projects or specialty certifications.

Measured quantities, clear trade boundaries

Inspect 90 selected lines and 6 cropped drawings in our coordinated MEP sample. This excerpt demonstrates the published quantity format; it does not substantiate every specialty service or a complete project price.

Division 22: Plumbing

Reconcile fixtures and equipment against plumbing schedules. Keep domestic water, sanitary waste and vent quantities separate by material and size; identify fittings, valves and connection boundaries. Pipe sizing and medical-gas design require the issued design and qualified review.

Plumbing estimating scope

19 selected source lines available in the sample.

Division 23: Mechanical / HVAC

Reconcile HVAC equipment tags, air outlets and ductwork against the mechanical schedules. Keep duct length, area or weight units distinct. Confirm whether hydronic or refrigerant piping, insulation, supports, controls and testing are included in the quoted scope.

Mechanical / HVAC estimating scope

32 selected source lines available in the sample.

Division 26: Electrical

Reconcile lighting and device counts against schedules. Distinguish conduit route length from conductor length, with conductor count and specified sizes recorded separately. Confirm feeds, disconnects and controls interfaces; fire alarm and low voltage require their own scope confirmation.

Electrical estimating scope

39 selected source lines available in the sample.

Agree these items before the takeoff starts

Confirm the drawing issue and addenda, measurement units, base quantities versus allowances, trade responsibility for equipment connections, and assumptions for missing information. A priced estimate also needs dated supplier pricing, labor basis, taxes, freight and exclusions agreed for your project.

Drawing-based coordination flags scope interfaces. BIM clash detection, engineering design, specialty process systems and code certification require a separately confirmed scope and supporting documents.

Send plans for a scoped quote
Get Your Quote